Sourdough Proofing Time Calculator
Proofing time stretches when the dough is colder than the recipe and shrinks when it is warmer. This calculator applies a Q10 of 2: 10°C (18°F) colder means about twice as long. It returns adjusted minutes and a rise checkpoint. The dough’s volume, not the clock, decides when the stage is done.
Updated
Use this when the kitchen does not match the formula. Enter the hours the recipe allows, the dough temperature that recipe assumes, the temperature of your dough, and whether you are in bulk or the final proof. The result is a proof schedule: adjusted hours and minutes, a time multiplier, and a rise-to percent. A recipe written for 4 hours at 78°F / 25.6°C, with dough that is actually 72°F / 22.2°C, is planned for about 5 hours 2 minutes (302 minutes), or 1.26 times the written time. Bulk still aims for a rise to 40%. The final proof aims for a rise to about 50% in the basket.
The coefficient is Q10 = 2: fermentation rate roughly doubles for every 10°C. Five degrees Celsius colder is about 1.41 times the time. Five degrees warmer is about 0.71 times. The same gap is 9°F. Whole wheat and a very active starter can finish sooner. A refrigerator below 10°C / 50°F is a cold proof, not a long room fermentation. Set the grams in the dough calculator, the mixing water in the dough temperature tool, and the day in the bake planner.
Proof schedule
- Time multiplier
- 1.26×
- Rise checkpoint
- Rise to 40%
- Recipe dough
- 78°F / 25.6°C
- Actual dough
- 72°F / 22.2°C
Mark the container at the start of bulk. Plan to finish near a 40% rise, inside a 30–50% window, and only if the dough is also aerated and stronger than at the mix.
Closed decision: proof_schedule — bake toward this adjusted window, and stop the stage when the dough hits the rise checkpoint.
Enter a recipe time and two dough temperatures to see an adjusted schedule.
| Actual dough versus the recipe | Time multiplier |
|---|---|
| 10°C / 18°F colder | 2.00× |
| 5°C / 9°F colder | 1.41× |
| Same as the recipe | 1.00× |
| 5°C / 9°F warmer | 0.71× |
| 10°C / 18°F warmer | 0.50× |
What should I type in?
Recipe time is the stage you are about to run, in hours. A 90 minute final proof is 1.5. Recipe temperature is the dough temperature in that method, often the mid-70s °F / about 24–26°C for a room fermentation. Actual temperature is a probe in your dough. Room air is a poor substitute. Stage is bulk or final. Changing the stage does not change the multiplier. It changes the rise checkpoint you are watching for.
Why the rise mark outranks the minute count
A container mark is evidence. No single percentage fits every dough, which is why the bulk guide refuses a universal number. Forty percent is the planning checkpoint this tool prints for bulk, inside a 30–50% window, and only together with bubbles and strength. Fifty percent plus a slow spring-back is the planning checkpoint for a room-temperature final proof. If the dough hits the mark early, move on. If the clock expires and the dough is still dense, give it more time or warm it. Write both the plan and the actual finish in the bake log.
Read next
- Dough calculator for the grams, including starter flour and water.
- Dough temperature calculator for the water that gets you near this dough temperature.
- Bake planner once you have an adjusted duration to place on the day.
- Cold proofing when the dough is going into the refrigerator.
- Overproofed sourdough and underproofed sourdough when the rise, not the clock, was wrong.
- Winter sourdough baking for a cold kitchen that slows every stage.
- Bulk fermentation signs for what a 40% rise is supposed to look like beside strength.
Source and method
The Q10 = 2 coefficient is a planning model used to scale biological rates by 10°C steps. It is not a measurement from a Sourdough Bench test bake. King Arthur’s bulk fermentation notes make the matching point: time is a record you keep, and the dough’s expansion is what you judge. Calculations run in your browser.
Proofing time FAQ
Does a colder dough need more time?
Yes, as a plan. At Q10 = 2, dough that is 10°C / 18°F colder than the recipe is given about twice the stated time. Dough that is 10°C warmer is given about half. A 4 hour recipe written at 78°F becomes about 5 hours 2 minutes at 72°F.
Is bulk fermentation different from the final proof?
The temperature math is the same. The checkpoint is not. Bulk is planned to about a 40% rise, inside a 30–50% window, plus strength. The final proof is planned to about a 50% rise in the basket and a slow spring-back.
Can I use this for a cold retard in the refrigerator?
Only as a warning. Below 10°C / 50°F the room-temperature Q10 model is the wrong tool for a schedule. A cold final proof is its own stage. Read the cold-proofing guide and judge the dough after it has cooled.
Will the clock tell me the dough is ready?
No. The output is a proof schedule: an adjusted window plus a rise mark. Stop when the dough reaches that rise and looks aerated. An underproofed or overproofed loaf is a volume problem even if you hit the minute count.
Where do I set the water temperature before this?
In the dough temperature calculator, so the mixed dough starts near the temperature you typed here. Then record the actual reading in the bake log. This tool does not choose flour, water, or salt.
Share this page
The page link does not include your calculator values or notes.